(7-28-17) Mercer County Engineer, Jim Wiechart, strongly recommends that, as much as possible, the traveling public avoid the Mud Pike road corridor west of Celina, and the intersecting Fleetfoot and Hellwarth roads.

Mud Pike

“Over the course of approximately the next 7-10 days (weather permitting) intensive asphalt concrete resurfacing operations will be conducted by the contractor.  Through traffic should not utilize those 3 roads (Mud Pike, Fleetfoot, and Hellwarth).  Those needing to get to and from specific drive locations within this footprint of these roads should travel with the utmost caution and care in the construction area.”

 

Any additional questions, contact the Mercer County Engineer’s Office at 419-586-7759.

Advertisements