Source: Celina City Schools YouTube live stream, “Celina Board of Education Regular Meeting, 11/23/2026” , https://www.youtube.com/live/3bfzyHjNbMw —

Opening

  • Meeting called to order with the Pledge of Allegiance, followed by roll call. All five members present: Mr. Clouse, Mr. Schleucher, Mr. Huber, Mrs. Summer, and Mr. Huelsman.
  • No additions or changes to the agenda. Motion to set the agenda approved unanimously.

Facilities update (Phil Metz) — new building

  • Loose furnishings are being delivered: all classroom and office furniture has arrived.
  • Competition gym seating is complete (home, student, and visitor sections).
  • Auditorium seating is on site and being installed — electric retractable seating; carpeting is going on the steps, with seats to be attached later in the week. Metz said it fills the large performance area well.
  • Touch-up paint is underway throughout; the architects’ initial punch list has been received and will be worked through over about the next month.
  • Doors are being installed; metal shelving is going into storage rooms; loose cabinetry and desk units are going in.
  • Maintenance has moved the pottery wheels, drying racks, and kilns (two from the high school, one from the middle school) to the new building, ready for connection; the wood shop spent a couple of days moving heavy equipment so contractors can do dust-collector and hard-wiring connections.
  • Kitchen: a preliminary health department walkthrough went extremely well with no problems found — a couple of minor items (signage at handwash sinks; a soap/paper-towel dispenser at one sink). Final inspection is scheduled for next Monday at 11 a.m. for the food-service operational permit.
  • Spike’s Place and the concession stand are equipped (tables, warmers, coolers, popcorn maker, hot dog roller) and ready.
  • Fire alarms passed; the building is under fire suppression and smoke detection, and the fire department was pleased with what it saw. The elevator is connected and running.
  • Stage trim work is nearly done; mirrors and lights in the dressing rooms are being finished. Floors are not yet painted.

Public participation

Speakers had three minutes each. The dominant topic was the proposed fencing around the new athletic complex — three of the four speakers addressed it.

Teresa Howick, 7531 State Route 197

  • Asked about Head Start funds reallocated to buy two vehicles: if the purchase comes in under budget, does unspent money move to another fund? The board answered no — it is federal grant money, can only be spent on that grant, and unspent funds are returned to the federal government.
  • Asked about the reserve/carryover money. The treasurer said $2.8 million is set aside in the 070 capital projects fund, and the general fund balance carried over in 2025 was about $16 million.
  • Returned to a classroom she raised last month as messy: she has since met with the middle school and high school principals, who explained it is a STEM room meant for creativity, innovation, and problem-solving, and that she first saw it at the end of a nine-week grading period when projects were finishing. She said she understands that, but asked that students be taught to pick up after themselves.

Kevin Draiss — his backyard adjoins the proposed athletic complex

  • Supports the athletic complex but opposes a six-foot chain-link fence around the entire property.
  • Said revenue collection was given as the primary reason for fencing at the Nov. 18 meeting, yet the track and tennis courts would remain open outside ticketed events — so fencing individual ticketed facilities would accomplish the same purpose.
  • Said the permanent perimeter fence was described as doubling as construction fencing, but the practice fields are inside that perimeter, raising the question of how students would access them.
  • Safety concerns: the fence encroaches into a player safety zone in the northwest corner, and a continuous perimeter fence would restrict escape routes to the north and east in an active-threat evacuation.
  • Said the district repeatedly said it wanted to work with neighbors and find compromises, but asked what has actually changed since the Nov. 18 meeting — “explaining why a plan can’t change is not compromising.”
  • Noted he served on the levy committee for the building project and that the project has changed substantially, with compromises already made on flooring, roofing, locker space, and curbs to save money — yet additional spending is being considered on an extensive perimeter fence.
  • Asked the board to eliminate the perimeter fence and fence only the stadium and soccer facilities, collecting revenue there, adding more fencing later only if experience shows it is needed.

Kim Kramer

  • Supports everything Kevin said and asked to see movement in writing on where the fences will go, or whether they are going up at all. Said neighbors have been compromising and the school should compromise toward its neighbors as well.

Willie Klosterman

  • Thirded what Kevin and Kim expressed. Said Vince Barhorst of the engineer’s office and a contractor both told him the fence plan is “a done deal” with no compromise, despite the Nov. 18 meeting being presented as a chance to hear a compromise.
  • Said the fence as shown starts 10 feet back off his easement on Holly Street, with distances varying for the 22 neighbors (13 and 14 feet for some, 17 and 18 feet toward the northeast corner), and that the fence line is not square — he asked the board to “square up the fence” and reach a better compromise.
  • Noted his 40 years in real estate brokerage and cited a past drainage/overflow project near Bella’s that he said harmed farmers and led to a lawsuit, as a caution about engineering decisions.
  • Said the neighbors in the room have lived there 18–20-plus years, are veterans and Bulldogs, and that it felt like “Bulldogs fighting with Bulldogs.“

Treasurer’s report (Michelle Shinn)— approved unanimously

One motion covering all of the following, approved on a unanimous roll-call vote:

  • Minutes of the October 19 meeting.
  • October cash summary report: revenues $10,213,194.38; expenditures $5,544,968.78.
  • Cash reconciliation report: balance $60,625,500.19, of which $26,275,946 is for the building project.
  • Checks written for October.
  • FY27 permanent appropriations as presented.
  • Auxiliary services transfer of $574.37 and carryover of funds from grant year 2026 to grant year 2027.
  • Acceptance of an extensive list of donations, totaling over $44,000 by the board’s own count:
  • $700 from Pretty Lamers and Shaboni [transcript spelling] for the middle school musical.
  • $500 from Spike’s Place for the CHS Key Club toy drive.
  • $1,000 from the Celina Moose to the CHS Key Club toy drive.
  • $1,000 from Home and Inc. [transcript spelling] for jackets for TriStar Industrial Technology and Construction Programs.
  • $500 each from Amcorp, Shookman/Shockman Lumber, Plyman Landscaping, Stockler Concrete, Tom’s Construction, St. Henry Tile, and Cartman and Company — jackets for TriStar Construction. (Donor names as rendered in the transcript; spellings uncertain.)
  • $550 from Bud’s Chrysler Dodge Jeep Ram for jackets for the construction program.
  • $1,125 from Machine Products for the TriStar Engineering and Robotics and Automation Programs.
  • $600 from the Athletic Booster Club to the high school Key Club for rally towels.
  • $2,892 from the Key Club to the high school student council for homecoming admission tickets.
  • $500 from Abby Wetzel to the CHS FFA convention.
  • A 2016 Ford Explorer police cruiser valued at $4,500 from the Auglaize County Sheriff and County Commissioners to the TriStar Law and Public Safety Program.
  • $15,000 each from the Celina Eagles and the Celina Moose toward transportation for the eighth-grade Washington, D.C., trip.
  • $3,000 from MSI Environmental, $500 from Tuni Farms, and $500 from Lefeld Industrial and Welding to the TriStar Welding Program for the Pack the Pallet food drive.
  • $1,000 from the Mercer County Civic Foundation to TriStar Career Awareness for supplies and recruiting projects.

Superintendent’s report (Brooke Gessler) — all items approved unanimously

A. Personnel

  • Approved Attachment 1 personnel as presented, plus GAN and CaseBolt for extended school year services for students with special needs for the 2026–27 school year.
  • Called out: Paula VanTilburg approved as the next TriStar director, beginning next August. The selection was unanimous among the nine superintendents from Auglaize and Mercer counties who ran the process; she will be only the third TriStar director in about 30 years.
  • Called out: Nancy Hulgarn is retiring in January after approximately 28 years with the district, about 26 of them in food service.

B. Stipend payments

  • Approved stipends for existing programs, including the Just Do It program, Wednesday School (a disciplinary step), and building leadership team members (part of the district’s continuous-improvement structure).
  • Called out: Brenda Speck, a retired TriStar med prep instructor who stepped in this year while the new instructor was on medical leave, doing the lesson plans and more than a substitute would normally do — the stipend acknowledges that work.

C. Other business

  • Approved an overnight trip for the cross-country team to Lancaster, Ohio, this summer. Coach Jason Andrew anticipates 20 to 30 students; the trip is for training and conditioning ahead of next season.
  • The board took a moment to note the cross-country team’s year: a state runner-up (girls division), three or four athletes at state, the girls’ league championship, and Jason Andrew named girls Coach of the Year.
  • Approved the policies presented at the previous meeting for first reading.

D. Head Start

  • Approved the Head Start report as presented.
  • Approved a carryover request for a supplemental nutrition grant of $11,874 from fiscal year 2026 to 2027. The plan is to start a greenhouse in the new Head Start portion of the middle school once the 1303 grant comes through and renovations are done — a community project intended to involve parents.
  • Approved a memorandum of understanding for Celina City Schools Head Start / Celina Preschool, aligning the language on employee retention with actual practice.
  • Approved the Head Start administration compensation plan, clarifying administrative pay, leave, insurance, and severance. The only change is an adjustment to administrative salaries effective December 1, to align with the grant cycle (the same adjustment was already made for classified employees) so payroll can pay those employees.

Executive session

  • The board voted to go into executive session for reasons of employment. The motion passed; the board stated it would not be voting on anything afterward. No adjournment is captured in the transcript.