(5-1-25) Starting at 7 a.m., on Monday, May 5th, the Ohio Department of Transportation will be removing current pavement markings on US 127 and preparing the roadway for the new configuration.

During construction, motorists will not be allowed to make left turns from Children’s Home Bradford Road onto US 127 or cross US 127. Barrels will remain in place throughout the duration of the project.

Once the work is complete, US 127 will feature a designated left-turn lane in each direction, while the right lane in each direction will serve as both a thru and right-turn lane.

Work is expected to be completed by the end of the week; however, it is weather-dependent.

If you must drive in this area during this time, please be attentive and use additional caution while traveling in work zones. Slow down and eliminate distractions.